Current Offerings

    • +,- 1,479 Acres

    • Natural Gas Surfacing

    • Above Ground Water Access

    • High Voltage Lines

    • Interstate Access

    • Rail Access

    • Fiber Connectivity

    • Gas Feasibility: Natural gas surfacing of four major lines on-property provides immediate access to excess BCF/d.

    • Grid Connectivity: 115kV line with substation.

    • +,- 66 Acres

    • Aquifer Access

    • Low-Latency Fiber Connectivity

    • Favorable Logistical Access

    • Grid Connectivity: Medium voltage infrastructure will serve this site with grid connectivity.

    • +,- 398 Acres

    • Grid Connectivity

    • Aquifer Access

    • Well Access

    • Redundant Low-Latency Fiber Connectivity

    • Favorable Logistical Access

    • Grid Connectivity: Medium voltage infrastructure and favorably positioned substations will serve this site with grid connectivity.

    • +,- 587 Acres

    • Grid Connectivity

    • Aquifer Access

    • Low-Latency Fiber Connectivity

    • Favorable Logistical Access

    • Grid Connectivity: Medium voltage infrastructure and favorably positioned substations will serve this site with grid connectivity.

    • +,- 5,195 Acres

    • Grid Connectivity

    • Redundant Low-Latency Fiber Connectivity

    • Favorable Logistical Access

    • Grid Connectivity: High voltage infrastructure and favorably positioned substations will serve this site with grid connectivity.

    • +,- 8.8 Acres

    • On SIte Substation

    • Aquifer Access

    • Grid Connectivity

    • Grid Connectivity: Substation on property.

    • +,- 108 Acres

    • Existing Energy Infrastructure

    • Favorable Logistical Access

    • Aquifer Access

    • Redundant Low-Latency Fiber Access

    • Grid Connectivity: Existing high voltage infrastructure on site and substations in favorable proximity will serve this site with grid connectivity.

    • +,- 400 Acres

    • Existing Energy Infrastructure

    • Favorable Logistical Access

    • Aquifer Access

    • Redundant Low-Latency Fiber Access

    • Grid Connectivity: Existing high voltage infrastructure on site and substations in favorable proximity will serve this site with grid connectivity.

    • +,- 851 Acres

    • Existing Energy Infrastructure

    • Favorable Logistical Access

    • Aquifer Access

    • Well Access

    • Surface Water

    • Redundant Low-Latency Fiber Access

    • Grid Connectivity: Existing high voltage infrastructure on site and substations in favorable proximity will serve this site with grid connectivity.

    • +,- 12 Acres

    • Dual Aquifer Access

    • Redundant Low-Latency Fiber

    • Existing Energy Infrastructure On-Site

    • Grid Connectivity: Medium voltage infrastructure on site provides grid connectivity.

    • +,- 191 Acres

    • Surface Water Access

    • Redundant Low-Latency Fiber

    • Existing Energy Infrastructure On-Site

    • Grid Connectivity: Medium voltage infrastructure on site and favorable substation positions provide grid connectivity.

    • +,- 522 Acres

    • Aquifer Access

    • Surface Water Access

    • Redundant Low-Latency Fiber

    • Existing Energy Infrastructure On-Site

    • Grid Connectivity: High voltage infrastructure on site and favorable substation positions provide grid connectivity.

    • +,- 867 Acres

    • Aquifer Access

    • Surface Water Access

    • Redundant Low-Latency Fiber

    • Existing Energy Infrastructure On-Site

    • Grid Connectivity: Medium voltage infrastructure on site and favorable substation positions provide grid connectivity.