• ± 1,479 Acres

    • Natural Gas Surfacing

    • Above Ground Water Access

    • High Voltage Lines

    • Interstate Access

    • Rail Access

    • Fiber Connectivity

    • Gas Feasibility: Natural gas surfacing of four major lines on-property provides immediate access to ±2.9 BCFD in available capacity with ±6.4 BCFD in total system capacity.

    • Grid Connectivity: 115kV line with substation.

Sites

    • ± 720 Acres

    • Natural Gas Surfacing

    • High Voltage Lines

    • Fiber Connectivity

    • Interstate Access

    • Rail Access

    • Aquifer Access

    • Gas Feasibility: Natural Gas pipelines on site with ±500 MMCF available and ±2.1 BCFD total system capacity

    • Grid Connectivity: Substation in close proximity & 115kV lines running through site

    • ± 32,000 Acres

    • High Voltage Lines

    • Fiber Connectivity

    • Water Sourcing Solutions

    • Gas Feasibility: On-Site wells & pipelines with ±74.3 BCFD in proved undeveloped well reserves

    • Grid Connectivity: Multiple Substations with 115kV, 138kV, and 230kV lines on-site.