-
± 1,479 Acres
Natural Gas Surfacing
Above Ground Water Access
High Voltage Lines
Interstate Access
Rail Access
Fiber Connectivity
-
Gas Feasibility: Natural gas surfacing of four major lines on-property provides immediate access to ±2.9 BCFD in available capacity with ±6.4 BCFD in total system capacity.
Grid Connectivity: 115kV line with substation.
Sites
-
± 720 Acres
Natural Gas Surfacing
High Voltage Lines
Fiber Connectivity
Interstate Access
Rail Access
Aquifer Access
-
Gas Feasibility: Natural Gas pipelines on site with ±500 MMCF available and ±2.1 BCFD total system capacity
Grid Connectivity: Substation in close proximity & 115kV lines running through site
-
± 32,000 Acres
High Voltage Lines
Fiber Connectivity
Water Sourcing Solutions
-
Gas Feasibility: On-Site wells & pipelines with ±74.3 BCFD in proved undeveloped well reserves
Grid Connectivity: Multiple Substations with 115kV, 138kV, and 230kV lines on-site.